Pro Service Painting Inc.250-864-7653Book an estimate

Strata field notes · Brock and Justin Thorvaldson

How to compare strata hallway painting quotes.

When three bids land on the council table, the first question we’d ask is whether all three crews priced the same hallway.

Before council votes

Take this list to the walkthrough or use it to ask each bidder the same five questions.

  1. Start with one floor

    Walk one representative corridor. List the walls, ceiling, baseboards, suite-entry door faces, stair doors and frames. Then note what changes floor to floor. A main-floor lobby and a typical upper hallway rarely have the same scope.

  2. Put door faces on a line of their own

    For a building with 20 suite doors, “paint doors” could mean 20 corridor faces, 40 faces if both sides are included, or just the frames. Write down which faces, edges and frames are in the price. Flag any work that needs a resident to open a door.

  3. Compare the preparation

    Ask how the contractor has allowed for patching old signs, repairing dents and dealing with worn trim. Pick a sample stretch together. If repairs are uncertain, ask how extra work would be priced and who would authorize it.

  4. Price the same work windows

    Daytime access on an empty floor is different from short shifts around occupied units. Agree on work hours, which routes must stay open and who gives notice. Ask how the crew will hand a floor back and identify any touch-ups.

  5. Give council one page

    For each bidder, record the included surfaces, preparation, coating and number of coats, access, exclusions, taxes, and earliest workable dates. Mark unanswered items and get clarification in writing before the vote.