Rental turnover painting in Kelowna
Get the suite ready for the next tenant. Tell us when we can get in, when you need it back and what needs painting. Send a few photos if you have them. Brock or Justin will confirm the scope, timing and price in writing.
See the move-out painting checklist ↓
Before
AfterOne suite between tenants
For a same-colour refresh, show us the worn walls, door frames and any patching. If the finish has aged, a full wall may give a more even result than spot touch-ups. Tell us if ceilings, trim or a colour change belong in the quote.
Recurring suite turnovers
We already work with property managers on monthly Okanagan apartment turnovers. If your buildings share layouts or paint colours, we can agree on a repeat scope and flag exceptions suite by suite. Start with one upcoming vacancy or tell us about your portfolio.
Kelowna apartment turnover
A two-bedroom suite between tenants
- What we painted
- The manager marked 13 walls, three closets, selected trim and the hallway side of the suite entry door. That gave us a room-by-room scope.
- How we scheduled it
- Painting was due two days before the planned move-in. The cleaners were booked for the day in between.
- The final walkthrough
- The walkthrough flagged a laundry wall and the inside edge of a door. The coordinator confirmed both touch-ups were finished the day before the scheduled move-in.
From keys to handback
- Show us the window. Send the earliest vacant access date and the day the suite needs to be ready. If the dates are still moving, tell us what you know.
- Confirm the scope. Brock or Justin reviews prep, paint and crew availability. A two-painter day can suit a straightforward refresh. Repairs, stains, colour changes or an occupied suite may need a different plan.
- Agree on handback. Before we book the work, we agree who can approve extras, how we’ll get in and when the suite goes back to you or the cleaners.
Move-out painting checklist
Walk through the suite with your phone. These six details help us put a useful quote together.
- Earliest access and requested handback or move-in date.
- Rooms and surfaces to include: walls, ceilings, doors or trim.
- Scuffs, patches, stains or repairs. Include a wide view and a close-up if possible.
- A can label, colour code or sheen, or let us know you need a match.
- Elevator availability and the windows for cleaners or other trades.
- Who can approve extra work and receive the suite when we finish.
