Strata hallway and stairwell painting in Kelowna.

Have a council meeting coming up? Tell us when you need the written quote and who can meet us on site. Brock or Justin will confirm a visit time, then walk a floor with you to mark the surfaces and plan how residents get to their doors.

Brock with the upper walls masked and the floor protected on an interior repaint
Brock on an interior repaint, with the upper walls masked and the floor protected.

Start where the hallway changes.

A typical upper floor might have one wall finish and ten identical suite doors. The lobby can add a double entrance, an elevator surround and a stair landing with a higher wall. We list those separately so council can see what each part of the building adds to the work.

During a winter repaint, we’ll ask which entrance residents use with wet boots, when deliveries arrive and where floor protection can stay between shifts. For stairs, we’ll walk the landings with your manager and agree on access before setting the sequence.

For your walkthrough

Build your hallway scope.

Count a typical floor once. We’ll work out how many door faces and frame openings that covers. You can add the odd floor, edit the result and take a copy to council.

Make the count on paper

For each group, multiply the openings on one floor by the number of identical floors. For door faces, multiply again by the door leaves in each opening and the faces you want painted on each leaf. Count one frame per opening, even for a pair of doors sharing a frame.

Record the lobby and any different floors on separate lines. Mark walls, trim, ceilings, access hours and repairs on each line and bring the list to your walkthrough.

Request a strata walkthrough

What goes in the written estimate?

The sample section

Walk one door and one stretch of wall together. Mark old sign holes, chipped corners and trim repairs. Decide whether the crew is painting the corridor face, edges, frames or both door faces. If a door has to open, agree who arranges access with the resident.

The first work zone

Pick a floor, wing or landing. We’ll identify where materials can go, which routes residents need and who can approve a change. Put the agreed work hours and handback contact in writing before the first notice goes out.

Options for council

Ask for a base scope and list extras separately. A wall repaint can be one decision. Adding suite doors, repainting the stairwell or repairing a damaged corner can each be another. Use the bid worksheet and resident notice at your meeting.

Touch-ups after handback

Keep the product, sheen and colour code for each surface. A maintenance painter needs to know which white belongs on the baseboard and which one goes on the door. Make a finish record for your building.

Local work you can look at.

On one Kelowna residential building, our work record separated three ground-floor corridors. The elevator-hall scope called out walls with visible deficiencies. On your walkthrough, we can mark which walls need repair and which can stay as they are.

At Ellis Court in downtown Kelowna, council’s colour rendering exposed an exterior fascia missing from the original scope. The same question applies inside a building. Where does one finish stop and the next one start?

The photos from our open-ceiling commercial interior show how we reached high surfaces. Bring a wide stairwell photo to your walkthrough so we can see the landing and the approach as well as the wall.

Talk to Brock or Justin

Walk a floor with us.

Bring a floor count, a rough idea of the work and the date your council needs a price. We cover Kelowna, West Kelowna, Lake Country and Peachland.