Repainting an operating business
Plan a repaint around your working day in about 90 seconds. You’ll see your first three steps before we ask for an email.
Working through a commercial repaint
Download our strata and commercial project bookMap a normal operating day
- Walk the property during a typical shift. Mark customer entrances, staff routes, receiving areas and the surfaces people touch most.
- Record when deliveries, cleaning and customer traffic are heaviest. Identify a site contact who can answer access questions while the job is underway.
- Take one wide view of each zone and a close-up of exceptions. Check with the business before photographing a private work area.
Price a base scope with options
- List walls, pillars, bulkheads, doors and frames by zone. Put the storefront fascia, exterior elevations and signage on separate lines where they have different access requirements.
- Separate damaged areas and finish changes from repeated surfaces. Decide which optional work only makes sense while the area is already clear.
- Ask bidders to state their assumptions about work hours, site protection, access equipment and who moves stock or fixtures.
Agree on handback by zone
- Set an order for the areas that can close. Agree who signs a zone back into use and how staff will hear about changes.
- Record the location, colour, product and sheen in a shared finish schedule. Keep a dated photo and the agreed touch-up list beside it.
- At the next maintenance walk, check the same high-traffic doors, corners and counters before deciding whether the next phase needs touch-ups or a larger repaint.

A sample work plan for a shop that stays open
Say the delivery comes through the back door at 8 a.m. and the front counter is busiest at lunch. We’d walk both routes with the manager before dividing the floor.
- Before opening. The manager clears the rear display and confirms where deliveries can land. The crew protects stock and sets up in the first agreed work area.
- During trade. Customers keep an agreed route to the till. Staff know who can pause the work if the queue or a delivery needs the space.
- After the rush. The lead and manager inspect the first section, record touch-ups and agree when stock can go back. The coating and site conditions determine reopening time.
- Next work window. Move to the front counter only after the first zone can take customers again. Price any separate after-hours visit as its own line.
Bring these to the walkthrough
- A floor sketch with customer, staff and delivery routes.
- Your busiest hours, keyholder contact and one work area you can give us first.
- The surfaces you want included and the person who can sign off each area.
Common questions
Should a quote include after-hours work?
If the business needs the area during trading hours, ask for the available work window and any after-hours price option in writing. We can review the schedule at a site visit.
How can we break a bigger project into smaller visits?
Group surfaces that share access, protection and preparation. Ask for a base phase and clearly defined options, with the handback contact and timing noted for each.
What can we plan during winter?
Interior offices, customer areas or common rooms can be reviewed for a quieter trading period. List the dates available so the painter can assess access, sequence and crew availability.