Guide 6 of 10

One building finish schedule, with room for suite exceptions

Keep a building default and record where an individual suite departs from it. A short exception beside the room can save an unnecessary colour match at the next turnover.

Keep the suite exception. Building standard · Suite and surface · Verified finish.
Example finish record fields when one unit differs from the building standard.

Keep the building standard on one record and put individual suite exceptions on another. If Suite B received a different wall finish after a repair, the next work order should make that difference visible. Changing the master list to match Suite B can send the wrong paint to every other suite.

Give the standard a version

Record the building identifier, effective date, product line, colour name or code, sheen and surface for each standard finish. List walls, ceilings, door faces, frames and baseboards separately where they differ. “All off-white” is difficult to order from. A legible photo of the verified label beside the written details lets someone check a transcription.

Keep the actual source for each entry. A can labelled with the room and used on the last verified repaint is more useful than an unmarked leftover in a storage locker. If a colour is an old match with a custom formula, record where that formula came from. A colour name on a maintenance spreadsheet alone may leave the product and sheen unresolved.

Add the exception at the smallest useful location

Illustrative entry. “Building A default, walls, version 2. Suite B follows version 2 except the living-room window wall, which received a different approved sheen on the last repaint. See the dated room record and can label before ordering for that wall.” The same note could apply to a previously changed closet interior, a replacement door or one wall still awaiting a larger repaint.

Use three states people can read quickly. Verified means you have a record tied to that surface. Assumed means it looks like the default but needs a check. Unknown means you want the painter to recommend how to identify it. Keep an assumption from turning into a verified entry just because someone copied it to the next vacancy list.

Hand the record to the next person

Try the existing paint and finish record for the room-level entry. The browser save is handy on the device you use. Print or save a copy for your building’s own records when another manager or vendor needs it. File the label photo with that copy and mark the update date.

On the weekly vacancy list, a note such as “Building A v2, verify living-room exception” is enough to point the estimator to the right information. Confirm the actual finish before promising a spot touch-up on an older wall.