Pro Service Painting Inc.250-864-7653Estimate options

Guide 4 of 10

What does “paint all the balconies” leave out of a strata budget?

Compare a front-band repaint with an entire balcony assembly. The two scopes can look nearly identical on a colour rendering and involve very different surfaces and access.

Lighter balcony columns meet dark window panels above the brick base
At Ellis Court, balcony openings, columns and projecting bays break a single elevation into several measurable surfaces.

Two bidders can look at the same building and price different projects from the words “all balconies.” One sees the front bands visible from the street. The other includes recess walls, columns, side returns, undersides and railings. Before worrying about the difference between their totals, give both bidders the same balcony to break down.

Price the face people see first

Start with a straightforward base option. On one typical stack, identify the front face or band, where it starts and ends, and whether the band wraps around at the end unit. State the number of matching examples. Attach a photograph with the relevant face outlined. If only one side of the building is in this year’s budget, put that limit on the same line.

Then price what sits behind it

An illustrative expanded option might add the underside overhead, the two short returns and a specified wall inside each recess. Ask whether the rail finish, columns and divider faces are included or priced separately. A balcony floor, waterproofing system or other specialist surface needs its own confirmed scope before it can be included. Record access assumptions for each addition. Reaching a front band from outside and working behind a resident’s furniture can be quite different jobs.

On our four-storey balcony and stucco repaint, the finished grey bands continue around the end wall. That turn is easy to see in the project photos. Use your building’s own end bay to check whether a similar turn is included in the count.

Give council a comparison it can vote on

Collect the base, each additional surface and any shared access cost on one sheet. Ask bidders to explain where deciding later would bring equipment or protection back a second time. Council can then select the visible refresh, approve a broader assembly or defer a clearly identified component. Keep the marked base and accepted options with the agreement. They tell the crew precisely how far “all the balconies” goes on this job.

Your project checklist

Read next