Who can authorize a repair found during a strata exterior repaint?

Set the allowance and approval route before the crew opens up a problem area. A location, photo and written decision let council see exactly where the original scope ends.

When an allowance changes. Document the condition · Review scope and price · Record authorization.
Illustrative chain for a repair that needs a decision before the scope expands.

Decide who can authorize a change while council still has time to think. Once access equipment is in place and a previously hidden area becomes visible, the manager may need an answer quickly. An agreed allowance, a named decision contact and a fallback when that person is unavailable give the crew a practical way to proceed within the accepted scope.

Define what the allowance buys

A number beside “repairs” has limited value until both sides say what it covers. For example, a proposed allowance could cover a specified preparation treatment on a recorded quantity of previously patched trim. A damaged piece that needs replacement is a different decision. Ask how the contractor will measure work against the allowance and how unused or exceeded amounts will be treated under the actual agreement.

Capture the finding before deciding

Picture a crew reaching an upper corner and finding damage behind the edge of an old repair. The manager needs a wide view of the corner, a detail, the finding in ordinary language and the affected area of the agreed scope. Ask for the next proposed step and whether an assessment by another trade is needed. The contractor should state what can continue elsewhere and how a delayed answer would affect access or a return visit.

A short request might read, “Building B, north end, upper trim return. See marked photo and original scope line. Please confirm whether you want the proposed additional work under the attached adjustment, further assessment or the area deferred. The rest of this phase can proceed as described.” Include the specific cost and schedule information from the contractor each time.

Keep one decision record

The manager can confirm who has authority under the building’s own process. Record the written decision, date and remaining allowance, then send the accepted instruction to the person on site. Bring any deferred item back at handback so it stays visible to council. The strata repaint planner can help organize the original assumptions for comparison when a change request arrives.