Guide 2 of 10
Who confirms which balcony surfaces the strata can approve?
Make an inventory of the disputed surfaces and give each unresolved item a decision owner. The estimate can then distinguish confirmed work from work waiting on authorization.
A bidder can identify a balcony divider, an outside rail and a wall return from the street. Appearance alone cannot tell the bidder who can authorize painting them. If council is uncertain about a surface, name it precisely and give the manager a way to resolve the question before it becomes an instruction to the crew.
Start with a location anyone can find
Use a building name, elevation and bay reference. Describe which face of the piece is at issue. “Inside of solid divider between the second and third recesses on the courtyard side” points to something that can be checked. “Private side” assumes the answer to the very question the manager needs to settle. A photograph with two arrows is usually enough to distinguish the neighbouring faces.
Keep the painting question and the authority question together
For each item, record the existing finish, the requested work and the person responsible for confirming the scope. The manager or council can identify the applicable plan, bylaws, prior approval or other building records, and seek appropriate advice if the answer is uncertain. A painter can then advise on preparation and access for the work the building actually authorizes.
Consider an illustrative bay where council has confirmed the front band and common wall, while one divider face is still under review. The confirmed items can go in the base request. The divider can be identified as an unapproved option for comparable pricing, if council wants that information. An option appearing in a bid does not give the crew permission to paint it.
Carry the decision onto the drawing
Record the date, document reference and person who issued direction. Attach the revised marked-up elevation to the written scope and send the same version to each bidder or the selected contractor. Keep the earlier drawing labelled as superseded. The Ellis Court balcony photo exercise shows how a narrow strip can disappear between the rendering and estimate. Here the extra column matters just as much as the label on the photo. It tells the manager whose answer releases the work.