How to put two painting options on the strata meeting agenda

Separate the base repaint from choices council can approve independently. A short decision line tells the manager exactly what to instruct after the vote.

Prepare the council motion. Base scope · Optional work A · Optional work B.
Record what council can approve separately on the same written quote.

Give council a base project it can understand even if it accepts neither option. “Repaint halls and doors as discussed” leaves the manager to interpret a conversation. “Repaint the corridor walls on floors two to four under the attached scope” gives the meeting a clear starting point. Then state what each additional choice changes.

Make each option possible on its own

Suppose the base quote covers corridor walls and their agreed preparation. Option A adds the corridor faces of the suite doors. Option B adds the frames around a specified set of common-room openings. Neither option should silently assume the other. Ask the contractor to flag any shared setup, access window or price dependency. Council needs to know if the figures change when it approves A and B together.

Keep an access consequence beside each option. Door faces may introduce resident appointments. Frames in a common lounge may require a different closure. Include the quotation reference, revision, written amount and any timing conditions supplied by the contractor. A meeting packet with three estimates should identify which contractor and revision every option belongs to.

A decision line the manager can use

Here is an illustrative agenda entry to adapt to the building’s own approval process. “Decide whether to accept the corridor-wall base in the attached revised quote. Record separately the choice on Option A, corridor faces of suite doors, and Option B, the listed common-room frames. Identify who will confirm access and communicate the accepted scope to the contractor.” Leave room beside each option for accepted, declined or deferred.

Close the gap between minutes and site

After the meeting, check the minutes against the quote and send the selected lines to the contractor in writing. A deferred option can stay on the future-work list without appearing on the crew’s instructions. If two bids still describe different surfaces, use the hallway bid comparison to ask for clarification before the decision. The council toolkit gives you working sheets to carry into the meeting.